
Emergency Pumping | Capão Redondo Detention Basin
Emergency pumping at the Capão Redondo detention basin, with a total flow of 3,630 m³/h.
Emergency pumping at the Capão Redondo detention basin, with a total flow of 3,630 m³/h.



+4 registros na galeria abaixo
Sobre o projeto
Obracon deployed motor pumps to lower and transfer water in the reservoir under emergency conditions, with suction and discharge installed in the basin.
Galeria do projeto
4 fotos



Outros projetos realizados

Pumping | Praça Artur Alvim
São Paulo - SP
The Pumping project at Praça Artur Alvim is part of Obracon's portfolio of solutions applied to urban drainage and suppo
Ver case
Pumping | Parque Itaim Biacica
São Paulo - SP
Pumping at Parque Itaim Biacica represents Obracon's work in drainage and pumping systems applied to urban areas requiri
Ver case
Pumping | Foz de Chapecó Hydroelectric Plant
Pumping at the Foz de Chapecó Hydroelectric Plant is part of Obracon's portfolio in pumping applications associated with
Ver case
Polders | Marginal Tietê
The presence of the Marginal Tietê Polders in Obracon's portfolio reinforces the company's experience in urban pumping s
Ver case